Boland Kourdov

Your SUPER-powered WP Engine Blog

Updates to the town house – the first year

June 12, 2011 by sueboland

We are nearing a the end of our first year here in Arlington and I thought I would list what we updates we haev made to our move in ready condo

* Replaced the washer and dryer
* Repaced the dish washer
* Replaced the hot water heater
* Replaced and secured floor board in the attic
* Replaced and rebuilt the stairs in the basement
* Replaced and rebuilt the stairs to the basement from the outside
* Replaced the upstairs toliet
* Replaced the ceiling fan in
* Installed a timer in the bathroom for the fan
* Switched out the vanity installed double sink
* Replaced the medicine cabinate with a large mirror and wall scones
* Added closet maid organization to the hall, office, bathroom, and all the bedroom closets
* Replaced the shower head
* Replaced the shower rod
* Painted all the rooms in the first and second floors
* replaced the thermostat

Filed Under: house2home

Recent Posts

  • Hello world!
  • Vince has Strep Throat
  • Sometimes I have bad days
  • Nursery Take 2
  • Boy Names?

Recent Comments

    Archives

    • November 2017
    • September 2013
    • August 2013
    • July 2013
    • November 2012
    • December 2011
    • November 2011
    • October 2011
    • August 2011
    • June 2011
    • April 2011
    • May 2010
    • April 2010
    • March 2010

    Categories

    • Abby
    • house2home
    • living with a baby
    • Maggie
    • Sue Interrupted
    • Things kids say
    • Uncategorized
    • web developer

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    Copyright © 2026 · Beautiful Pro Theme on Genesis Framework · WordPress · Log in